2026 guide · Wallonia · Brussels · France

Planning permits in Belgium: the 2026 guide

When, how much, how and why to apply for a permit. The essentials, region by region, updated for 2026.

  • Wallonia (CoDT)
  • Brussels (CoBAT)
  • France (PLU)
Map of the regions covered by Airplan: Wallonia, Brussels and France

Answers to all your questions about planning permits: when, how much, how and why to apply. Choose your region to open the detailed guides.

Wallonia

01

Planning permits in Wallonia

In Wallonia, a planning permit is required for projects such as building or extending a building, altering the topography, demolishing a structure, or installing advertising or signs. The municipality is responsible for issuing the permit and checks compliance with the laws and regulations in force. Some works can be carried out without a permit or with a simplified permit. The cost of a planning permit depends on the nature of the application. It is important to apply for the permit before starting work.

Airplan illustration: planning permits in Wallonia

Brussels

01

Planning permits in Brussels

In the Brussels-Capital Region, planning permits are governed by the CoBAT (Brussels Spatial Planning Code). A permit is required to build, convert, extend or demolish a building, and for significant changes to its external appearance. Depending on the type of project, the permit is issued by the municipality or by the delegated official (urban.brussels). Some works are exempt from a permit under the exemption order. Processing times range from 75 to 450 days depending on the procedure. An architect is mandatory, except for the exceptions provided for by the CoBAT.

Airplan illustration: planning permits in Brussels

Flanders

01

Planning permits in Flanders

The dedicated guide to Flanders is in preparation. Check back soon for the procedures, costs and timescales specific to the Flemish Region.

Airplan illustration: planning permits in Flanders

France

01

Building permits in France

In France, the building permit (permis de construire) and the prior declaration of works (déclaration préalable) are the two main planning authorisations. They are reviewed by the town hall of the municipality where the project is located and check compliance with the rules of the Local Urban Plan (PLU). A prior declaration is enough for small works (less than 20 m² of floor area), while a building permit is required above that. Using an architect is mandatory for any construction exceeding 150 m² of floor area. Processing takes 1 month for a prior declaration and 2 to 3 months for a building permit.

Airplan illustration: building permits in France

Frequently asked questions about planning permits

When is a planning permit required in Wallonia?

In Wallonia, a planning permit is required for projects such as building or extending a building, altering the topography, demolishing a structure or installing advertising. Some works are exempt from a permit or fall under a simplified permit. The permit must be applied for before work starts.

Who issues planning permits in Belgium?

In Wallonia, the municipality is responsible for issuing the planning permit and checks compliance with the laws and regulations in force. In the Brussels-Capital Region, the permit is issued by the municipality or by the delegated official (urban.brussels), depending on the type of project.

What regulations govern planning permits?

In Wallonia, planning permits are governed by the CoDT (Walloon Territorial Development Code). In the Brussels-Capital Region, they are governed by the CoBAT (Brussels Spatial Planning Code). In France, the Local Urban Plan (PLU) is the reference for building permits and prior declarations.

How long does a planning permit take?

In Brussels, processing times range from 75 to 450 days depending on the procedure. In France, allow around 1 month for a prior declaration of works and 2 to 3 months for a building permit.

Is an architect mandatory for a planning permit?

In Brussels, using an architect is mandatory, except for the exceptions provided for by the CoBAT. In France, an architect is mandatory for any construction exceeding 150 m² of floor area.

In France, when do you need a building permit rather than a prior declaration?

In France, a prior declaration is enough for small works (less than 20 m² of floor area), while a building permit is required above that. Both authorisations are reviewed by the town hall of the municipality where the project is located.

See Airplan in action

Discover how Airplan makes it simpler to put together your permit applications.

Can't find the answer to your question?

Contact us with any question about planning permits.